Ballure Bridge Overhaul – Winter 2014/15 » Part 5, 11.01.15

5. 11th Jan 2015

At the start of 2015, work began on the refurbishment of the A2 road crossing to the north of the bridge, with both the rail crossing and road surface being replaced. © Andrew Scarffe

Please click ‘Ballure Bridge Overhaul – Winter 2014/15’ above this image in your browser to return to the main page.

Comments are closed.